GLOSS first bhasanamai Prime Minister KP Sharma Oli said, "is a year removed from the Traders." But, it is not his own, but local people to join a bridge lack of Jhapa Traders bhatole dajarnau bridge made of separate lives at stake to badhyachan walked by. Many do not know whether this story. However, the lack of bridge in Jhapa thriving South West VDC residents are forced to travel risky.
 
Lack of government interest in the construction of the bridge for traffic on the public complained that the complaints of the problem. Gaurigunj, Korobari, khajuragachi, Gwaldubba, Mahabhara, baigundhura, kunjibari, Jhapa.Earlier area residents, including the lack of concrete bridges built temporary bamboo and hazardous to confirm the opened reflux forced to cross a stream, including the former principal of the Korobari 1 sthaniyabasinda mind.Moderate he said.
 
Cisco, Lotus, Baniyani, including the lack of a bridge to river gorges. Mahabhara 4 and Korobari 1 to confirm the rumor the Lotus River made the door over, while temporary bamse until now people have been killed and two injured in an already kunjibari founder Govinda market Kunwar said.
 
He paved the road for nearly four years until Korobari AFP vitepani paved road amid the lotus pool when the water that had been a problem. He said, "The way the pitch is not the river to the bridge. When the bridge is relatively paved road has been no use. '
 
Immediate attention to the need for the authorities to make the bridge, he said. The location of schools, hundreds of students have been affected by the rainy season when the pool to be a teacher in the Child Welfare Secondary Korobari 1 narayanabahadura Karki said.

0 comments Blogger 0 Facebook

Post a Comment

 
SKY News NEPAL © 2013. All Rights Reserved. Powered by Blogger
Top